The facility is composed of two concrete masonry buildings bridged by a barrel vaulted steel gallery and central arcade. Covered seating areas are provided on the field side of the entry facility. The two buildings house a state of the are concession facility and restrooms (including family restroom) to service the facility. The facility is used seasonally and contains minimal conditioning and the ability to weatherize during the off season. Primary construction is concrete masonry with membrane roofs and steel fascia and arcade construction. The project was delivered as a multiple prime contract with construction management by Myers Construction.
Consultants - Hooting Coyote – Structural Engineering. Innovative Engineers – Mechanical, Electrical and Plumbing Engineering
Contractor – Myers Construction (Construction Manager)